Whitianga 16.8 sqm
6 x 2.8m
A versatile one-room pod with an optional kitchenette and bathroom. Layouts displayed are samples only and can be customised to suit your needs! Easily transportable on a hiab truck, it can be installed on skids, or placed on piles on site. Easy to heat and cool, this small pod fits neatly in any garden as a studio, sleepout or just use as an amenities pod for modular concepts.
- 16.8
- 1
- 1
- 1
Pricing from:
Sleepout only $94,800*
Guest Pod with ensuite $*114,400
Guest Pod with ensuite & kitchenette $121,960*
Amenities pod w kitchen & external toilet access $112,480*
*Incl. GST. Valid for build start Oct 01 - Jan 01 2025. T's and C's apply.
Features + Customisations
Process
You Dream. We Deliver
Our goal is to make it as simple as possible for you to meet your building needs. We take care of the design, consent, and installation with full project pricing so you can sit back and enjoy your new ecopod as soon as possible.
1
Enquire
You choose an ecopod and fill out our enquiry form below. We'll be in touch to discuss your project and customisation options.
2
Feasibility study
We understand your requirements and assess your site for access, consenting requirements and onsite works to provide a detailled estimate.
3
Sign contract
We draw up our Sale & Purchase Agreement for you to sign and issue the initial deposit which could be for just the consent stage or the full build.
4
Design & consent
We draft the design documents, and, if required produce architectural, engineering and service connection plans to submit for building consent.
5
Build & Site Prep
We build your ecopod in our manufacturing facility and pass council inspections while we prepare your site for delivery.
6
Project completion
We deliver your pod, connect it to water and electrical services, and complete finishing touches such as decks and landscaping.
Testimonials
Claim Your FREE Design & Build Consult
Get Started
FAQ
What other costs are involved?
Main costs are council consents, foundations, delivery, decks, steps, and water and power connections.
Where do you deliver to?
All pods delivered around North Island, pods less than 3.6m wide can be transported to South Island, onsite pod joins possible in Auckland
What are your lead times?
No consent 2 months, ex-factory building consent 4 months, full site consent 6-8 months